Our investment in Fényeslitke was a successful project, centered around the construction of the concrete pavement.

The concrete paving works of the Fényeslitke Intermodal Logistics Center were carried out by Bayer Construct Zrt. Using an SP64i slipform concrete paver, the pavement was constructed with nearly 30,000 cubic meters of concrete to ensure stability.

An additional 10,500 square meters of pavement was completed through manual placement, reinforced with various types of rebar. After the successful completion of joint cutting and surface finishing works, over 70,000 meters of joints were treated, considering the specific requirements of transverse and expansion joints. The project also involved the pouring of deep cuts in the concrete and the installation of steel dowels using drilling techniques. At the end of the construction, a vapor barrier layer was installed over 193,966 square meters to protect the pavement. The Fényeslitke project was completed efficiently and successfully, providing the logistics center with a durable and high-quality concrete surface.

Address

Contact

Find on Map

Other projects